Loading Bay - For Events Taking Place at Levels 2 & 3

Vehicles should proceed up the spiral ramp to level 6 loading bay, where bay 1 and 2 will be made available on a first-come-first-served basis. Loading bays are designed for loading/unloading only for a maximum duration of 20 minutes per vehicle. Storage of items is not allowed unless permission is granted in advance.

Event organisers and contractors are provided with 3 freight lifts, which can be used to access level 2 and 3 event spaces. For technical specifications, please refer to Technical Guide [Venue]. 

Heavy movements through Suntec City Mall at level 2 and the Centre on level 3 are restricted to evening hours from 2200hrs - 0700hrs daily. Contractors are required to protect the carpeted and tiled areas with plywood planking during move-in and move-out. 

Please see below examples of plywood planking that should be deployed for heavy move-in/outs:


For large and heavy items that cannot be pushed on a trolley or require the usage of a forklift/pallet jack, Suntec Singapore recommends that such items should be moved from the bay into the event space by an official freight forwarder. For a list of recommended freight forwarders, please refer to Partners Guide.

For more information, refer to the links below:


Was this article helpful?

Can’t find what you are looking for?