Contractors requiring to load or unload items at Level 1 [The Big Picture] should advise their Suntec Point of Contact in advance, in order to receive advice on the best access routing.
Placement of structures or build-up within this area should follow the space utilisation requirements in the Technical Guide [Venue]. Heavy movements are restricted to evening hours from 2200hrs - 0700hrs daily and contractors are required to protect the flooring with plywood planking for heavy movements during move-in and move-out.
Organisers should note that mechanical machinery such as forklifts, boom or scissor lifts are not permitted within this area.
For more information, refer to the links below: